Concrete pads, decking and paving bases
A poured 100–150 mm reinforced concrete slab costs roughly €100 to €150 per m² in Ireland (€900 to €1,500 for 3 × 3 m; €1,600 to €2,500 for 4 × 4 m). Over existing paving laid on sand, four hidden concrete pier footings cost €550 to €950.
What each ground surface costs underneath a permanent gazebo, when you can keep an existing patio, and how long fresh concrete must cure.
Free, no obligation. One local builder prices it, not five.
- €900–€1,5003 × 3 m concrete slab
- €1,600–€2,5004 × 4 m concrete slab
- €550–€9504 pier pads under paving
- €700–€1,200raised timber deck base

Three base options compared side by side
Full concrete slab
- 3 × 3 m cost
- €900 to €1,500
- Suited to
- Flat lawn, clay or hot tub
- Curing wait
- 5 to 7 days before heavy bolting
- Hot tub safe?
- Yes (125–150 mm + A142 mesh)
Pier pads under patio
- 3 × 3 m cost
- €550 to €950
- Suited to
- Finished porcelain or sandstone
- Curing wait
- 3 to 5 days for pad footings
- Hot tub safe?
- No (slab required under spa)
Timber deck base
- 3 × 3 m cost
- €700 to €1,200
- Suited to
- Sloping garden over 200 mm fall
- Curing wait
- Built in 1 to 2 days, no cure
- Hot tub safe?
- Only with engineered extra bearers
Price my gazebo
Four quick taps and our price shows before we ask for a phone number. One local builder rings you, not five.
A wooden pitched gazebo, 3 × 3 m, with a concrete pad on lawn: €3,100 to €5,700, supplied and fitted.
How the price is worked out
The range reflects typical supply-and-fit permanent gazebo costs in Ireland for that structure type, footprint and ground base. Patio figures cover bolting or pier pads under lifted slabs; concrete pad figures include excavation, hardcore and a poured slab. Side glazing, ZIP screens, tiled roofs and Safe Electric wiring for patio heaters or hot tubs are priced separately after a look. Ask whether VAT is charged at 13.5% or 23%. Use this figure to budget: only a builder who measures the spot gives a firm quote.
How builders anchor onto finished porcelain or sandstone patios
Homeowners who already spent €6,000 on an Indian sandstone or 20 mm vitrified porcelain patio do not want the entire terrace ripped up. Unless the patio was originally laid over a continuous 100 mm concrete sub-slab, bolting directly into individual flags risks cracking the porcelain and pulling up loose slabs in a storm.
- Lift just four corner flags. Your installer carefully lifts one flag at each corner post position without disturbing the rest of the patio.
- Dig and pour four 400 × 400 × 500 mm concrete pads. Each hole is filled with C25/C30 mix up to underside-of-bed level.
- Bolt post bases or refit neat cut slabs. Either drop threaded resin studs cleanly through diamond-cored holes in the relaid slab into the concrete pier beneath, or seat steel shoes flush and trim the flag neatly around the post.
Allow a 1:80 surface fall away from your house DPC on any new solid slab so puddles never pool inside the seating zone.
Related gazebo guides
Wind loads & anchoringResin studs, pier footings and why cheap pop-ups fold in gales.
Hot tub gazebosSpa roof heights, cover-lifter clearances, privacy walls and slabs.
Wooden pitched gazebosPressure-treated timber frames, pitched roofs and fitted Irish prices.
Hardtop metal gazebosGalvanised steel and twin-wall polycarbonate roofs built for gusts.
VAT rates & build timelinesRevenue two-thirds rule (13.5% vs 23%) and fabrication schedules.
What gazebos costFull Irish cost breakdown by style, footprint, base and extras.Common questions before you build
How much larger should a concrete slab be than the gazebo posts?
Pour the slab 150 mm to 200 mm wider on every edge than the outside of the corner posts so anchor studs stay safely back from concrete corners without spalling.
Can I place a permanent wooden gazebo directly on grass?
No. Soil holds damp year round and settles unevenly after winter frost, throwing roof joints out of square and offering zero storm uplift protection.
How long after pouring concrete can the gazebo be erected?
Allow at least 5 to 7 days in mild Irish weather before torqueing heavy anchor studs into a fresh slab so the concrete reaches adequate early strength.
What depth of concrete is needed under a hot tub gazebo?
Specify 125 mm to 150 mm of C30 concrete reinforced with A142 steel mesh over 100 mm compacted Clause 804 hardcore and a polythene membrane.
All gazebo pages and guides
Gazebo styles
Specs & rules

See your gazebo cost before anyone rings
Pick the style, footprint and base underneath. When you want a written quote, your outline goes to a single garden structure builder in your county.
